Documentation

The PW-Sat2 project documentation structure is divided into three main project phases. Each of the subsystems has its own numerical category which contains most important documents related to the specific team. In November 2016 the documentation went through overall makeover so the users are asked to download again the files that they may use.

The documentation of Phase C will be published by the end of 2016 and updated in forthcoming months, so please check this site for updates if you would like to refer to any of the documents.

Last update: 2016-11-28. Go to download section
fazyprojektu2016b

Phase 0** Phase A* Phase B** Phase C**
Organization PW-Sat2-0-00.00-MDR PW-Sat2-A-00.00-Overview-PRR PW-Sat2-B-00.00-Overview-PDR PW-Sat2-C-00.00-Overview-CDR
Mission Analysis PW-Sat2-A-00.01-MA-PRR PW-Sat2-B-00.01-MA-PDR PW-Sat2-C-00.01-MA-CDR
Subsystems ADCS PW-Sat2-A-01.00-ADCS-PRR PW-Sat2-B-01.00-ADCS-PDR PW-Sat2-C-01.00-ADCS-CDR
PW-Sat2-C-01.01-ADCS-ICD
COMM PW-Sat2-A-02.00-COMM-PRR PW-Sat2-B-02.00-COMM-PDR PW-Sat2-C-02.00-COMM-CDR
EPS PW-Sat2-A-03.00-EPS-PRR PW-Sat2-B-03.00-EPS-PDR PW-Sat2-C-03.00-EPS-CDR
PW-Sat2-C-03.01-EPS-ICD
OBC PW-Sat2-A-04.00-OBC-PRR PW-Sat2-C-04.00-OBC-CDR
DT PW-Sat2-A-05.00-DT-PRR PW-Sat2-B-05.00-DT-PDR PW-Sat2-C-05.00-DT-CDR
PW-Sat2-C-05.01-DT-Structural-Analyses
PW-Sat2-C-05.02-DT-Analytical-Calculations-and-Dynamic-Models
SunS PW-Sat2-A-06.00-SunS-PRR PW-Sat2-B-06.00-SunS-PDR PW-Sat2-C-06.00-SunS-CDR
PW-Sat2-C-06.01-SunS-ICD
CAM PW-Sat2-A-07.00-CAM-PRR PW-Sat2-B-07.00-CAM-PDR PW-Sat2-C-07.00-CAM-CDR
PLD PW-Sat2-C-08.01-PLD-ICD
Thermal Control PW-Sat2-A-09.00-TCS-PRR PW-Sat2-B-09.00-TCS-PDR PW-Sat2-C-09.00-TCS-CDR
PW-Sat2-C-09.01-TCS-Datasheet-v2.3 (spreadsheet)
Configuration PW-Sat2-C-10.00-CONF-CDR
PW-Sat2-C-10.01-CONF-MICD
PW-Sat2-C-10.02-CONF-MICD-Drawing
PW-Sat2-C-10.03-CONF-Bill-of-Materials (spreadsheet)
* – Polish and English versions available; ** – English version only; TBI – To Be Issued

Download

Comments are closed